| 690.2/55/PL/PERUMDA-TP/XI/2021 | PENGGANTIAN SPARE PART POMPA RUANG DISTRIBUSI BARAT POMPA NO. 1, 2 dAN 3 | - |
| 690.2/108/PL/PERUMDA-TP/X/2025 | Penggantian Sparepart Panel Intake No.1 dan Sparepart Pompa Intake No.2 | - |
| 690.2/20/PL/PERUMDA-TP/IV/2024 | PENGGANTIAN SPAREPART POMPA DISTRIBUSI 90 KW JALUR SUMMARECON | - |
| 690.2/15/PL/PERUMDA-TP/III/2024 | Penggantian Sparepart Pompa Distribusi Rawa Tembaga 132 KW No 2 | - |
| 690.2/16/PL/PPBJ/PERUMDA-TP/III/2025 | Penggantian Sparepart Pompa Distribusi Rawa Tembaga Pompa N0.1 KAP 160 KW dan Pompa No.8 KAP 250KW | - |
| 690.2/76/PL/PERUMDA-TP/VIII/2025 | Penggantian Sparepart Pompa Ruang Distribusi Resevoir 8000m3 Pompa No.03 Kapasitas 200KW | - |
| 690.2/30/PL/S/PERUMDA-TP/IV/2026 | PENGGANTIAN SPAREPPART POMPA BOSTER DISTRIBUSI SB 1 NO. 1, 2, 3, DAN 4 | - |
| 690.2/45/PL/PERUMDA-TP/VIII/2021 | PENINGKATAN JALAN LINGKUNGAN PRODUKSI (SAMPING M.E) THP-2 (PERUMDA TIRTA PATRIOT, KEL. MARGAMULYA, KEC. BEKASI UTARA, KOTA BEKASI) | - |
| 690.2/47/PL/PERUMDA-TP/VII/2024 | PENYUSUNAN DOKUMEN ANALISIS DAMPAK LALU LINTAS JARINGAN PIPA SPAM REGIONAL JATILUHUR 1 (KEC. PONDOK GEDE, KEC. JATIASIH, KEC. BEKASI SELATAN, KEC. BEKASI BARAT) | - |
| 690.2/57/PL/PERUMDA-TP/XI/2021 | PENYUSUNAN DOKUMEN UKL-UKL, PERTEK AIR LIMBAH DAN PERTEK TPS B3 (KAMPUNG DUA KEL. JAKASAMPURNA, KEC. BEKASI BARAT) | - |
| 690.2/57/PL/PERUMDA-TP/X/2021 | PENYUSUNAN DOKUMEN UKL-UKL, PERTEK AIR LIMBAH DAN PERTEK TPS B3 (KAMPUNG DUA KEL. JAKASAMPURNA, KEC. BEKASI BARAT) | Gagal |
| 690.2/22/PL/PPBJ/PERUMDA-TP/IV/2025 | PENYUSUNAN STUDI KELAYAKAN HILIR REGIONAL JATILUHUR I (KEC. BEKASI UTARA, KEC. BEKASI BARAT, KEC. BEKASI SELATAN, KEC. PONDOK GEDE, KEC. JATIASIH - KOTA BEKASI) | - |
| 690.2/07/PL/PERUMDA-TP/I/2024 | PERBAIKAN INSTALASI PIPA COLECTING TANK 1 | - |
| 690.2/31/PL/PERUMDA-TP/V/2023 | PERBAIKAN INSTALASI POMPA COLLECTING TANK 2, 3 DAN BOX PANEL DISPLAY METER RESERVOIR 2000 M3 | - |
| 690.2/107/PL/PERUMDA-TP/X/2025 | Perbaikan Instalasi Pompa Submersible Power 15KW Collecting Tank 1 dan Collecting Tank 3 | - |
| 690.2/41/PL/PERUMDA-TP/V/2026 | PERBAIKAN KEBOCORAN DAN RELOKASI PIPA DISTRIBUSI DIA. 250 - 50 MM WILAYAH ZONA 4 | - |
| 690.2/45/PL/PERUMDA-TP/V/2026 | PERBAIKAN KEBOCORAN DAN RELOKASI PIPA DISTRIBUSI DIA. 300 - 100 MM WILAYAH ZONA 3 | - |
| 690.2/31/PL/PERUMDA-TP/IV/2026 | PERBAIKAN KEBOCORAN DAN RELOKASI PIPA HDPE DISTRIBUSI DIA. 250 - 50 MM | - |
| 690.2/05/PL/PERUMDA-TP/II/2023 | PERBAIKAN KEBOCORAN PIPA DISTRIBUSI DAN PENGGANTIAN JEMBATAN PIPA DISTRIBUSI | - |
| 690.2/28/PL/PERUMDA-TP/VII/2022 | PERBAIKAN KEBOCORAN PIPA DISTRIBUSI DIA. 250 MM - 100 MM, SIFON DIA. 100 MM - 75 MM DAN PENGGANTIAN METER DIA. 100 MM | - |